Roncq Aquatic Centre
Water // Roncq
The project
Client: City of Roncq (59)
Programme: Construction of an aquatic centre
Areas: 2,527 sqm indoor (including 470 sqm of water surface)
Construction value: €6,200,000 excl. tax
Competition winner: 2021
Delivery: 2024
Project team:
Lead architect: COSTE Architectures
ETHIS: MEP and energy
HDM: Structural engineering, civil works
GD ECO: Quantity surveyor
SLAP: Landscape
ACOUSTIQUE VIVIÉ & ASSOCIÉS: Acoustician
Images: Illuminens
Project overview
Project overview:
A 318.5 sqm sports pool — a 150 sqm leisure-and-learner pool — toddler pool, stands, mineral decks. HQE reference: highly demanding targets — relationship of the building with its environment, integrated choice of construction processes and products, low-impact construction site, energy and water management, activity-waste management, cleaning and maintenance, hygrothermal, acoustic, visual and olfactory comfort, sanitary quality of spaces, air and water, bioclimatic design, preference for natural and durable materials, rainwater harvesting, water reuse (filter backwashing, toilets, foot-baths).
OFF-SITE construction method — Polymerised stainless-steel pools