Alain Mimoun Sports Complex

Water Innovation // 92500 Rueil-Malmaison

Alain Mimoun Sports Complex

The project


Client: City of Rueil-Malmaison

Programme: Construction of a multisports complex (swimming pool, gymnasium, sports rooms, rooftop running track)

Areas: 12,029 sqm (including 769 sqm of water surface)

Construction value: €33,400,000 excl. tax

Competition winner: 2017

Delivery: 2021

Project winner of the National Clef d'Or for general contractors in 2021


Project team:
General contractor: LEON GROSSE
Associate architects: Rudy RICCIOTTI Architecte - COSTE Architectures
Multi-disciplinary engineering & civil works: EGIS
Pool MEP: ETHIS
Structural engineering: LRING
HQE consultant: ETAMINE
Quantity surveyor: CYPRIUM
Acoustics: LASA
Maintainer: CRAM

Photos: Guillaume GUERIN


Alain Mimoun Sports Complex - photo 1
Alain Mimoun Sports Complex - photo 2
Alain Mimoun Sports Complex - photo 3
Alain Mimoun Sports Complex - photo 4
Alain Mimoun Sports Complex - photo 5
Alain Mimoun Sports Complex - photo 6
Alain Mimoun Sports Complex - photo 7
Alain Mimoun Sports Complex - photo 8
Alain Mimoun Sports Complex - photo 9
Alain Mimoun Sports Complex - photo 10
Alain Mimoun Sports Complex - photo 11
Alain Mimoun Sports Complex - photo 12

Project overview


Project overview:
Programme Construction of the sports complex in the L'Arsenal eco-district, comprising 1 sports pool 525 sqm with movable floor, 1 learner and leisure pool 215 sqm, 1 30 sqm water lagoon, 300-seat sports-pool stands, a catering area, a wellness area with hammam, saunas, jacuzzi, cold plunge, massage showers, balneo pool, Finnish terrace with outdoor sauna, banja, Nordic bath, jet showers, pool solarium, 1 gymnasium with competition court, training court, PPG room, parquet room, dojo, table-tennis room, stands, club-house, accessible roof terrace with sports fields, 250 m running track, athletics areas, and surroundings.
HQE reference: highly demanding targets — centralised technical management, relationship of the building with its environment, bioclimatic design, energy and water management,
water quality, hygrothermal comfort, digital boiler, rooftop rainwater retention beneath the sports field, natural-light distribution
via fibre optics. Hydraulic performance: 90 litres/bather. Total annual consumption: 2,500 kWh-FE/sqm of pool surface/year. Annual gymnasium consumption: 50 kWh-FE/sqm/year. Maintenance period: 12 years with energy-performance commitment. Coated stainless-steel pools.