MUANCE Prototype #1
Innovation // 34410 Vatry
The project
At the request of MUANCE®, COSTE Architectures studied a set of 50 collective housing units built using an innovative #off-site construction process.
The aim was to design low-carbon, low-cost homes.
Year of studies: 2021
Planned delivery of the first homes: 2023