Tourneroches Swimming Pool, Saint Cloud
Water Rehabilitation // 92210 Saint-Cloud
The project
Client: City of Saint-Cloud (92)
Programme: Major refurbishment of the swimming pool
Construction value: €2,955,449 excl. tax
Areas: 1,824 sqm (including 495 sqm of water surface)
Competition winner: 2008
Delivery: September 2010
Project team:
Lead architect: COSTE Architectures
MEP electrical engineering: TUAL (Nantes)
MEP HVAC engineering: ESSEC
Structural engineering: LAMALLE INGENIERIE (Paris)
Quantity surveyor: GD ECO (Lormaye)
Photos: Gilles PLAGNOL (Saint-Cloud)
Project overview
Project overview:
The swimming pool is composed of a sports pool and a learner pool.
The Tourneroches swimming pool in Saint-Cloud is set in a very urban site, beneath a residential building. The project addressed the comprehensive technical and functional refurbishment of the facility:
- technical overhaul of the water and air treatment,
- functional redistribution of reception – changing rooms – pool,
- new overall aesthetic of the spaces,
- energy upgrade