Tournesol Swimming Pool, Malaunay
Water Rehabilitation // Malaunay
The project
Client: City of Malaunay
Programme: Rehabilitation of the Tournesol swimming pool
Areas: 890 sqm indoor (including 300 sqm of water surface)
Construction value: €3,500,000 excl. tax
Competition winner: 2017
Delivery: early 2020
Project team:
Lead contractor: Baudin Chateauneuf
Architect: COSTE Architectures
MEP engineering: TUAL
Quantity surveyor: GD Eco
Engineering: Bielec
Dalkia
Acoustician: ABC Décibel
Project overview
Project overview:
The project fits within the volume of the existing Tournesol swimming pool, whose interior organisation has been reworked. Only the reception hall sits in an extension volume, to give it more space and visibility, while keeping access at the same place.
To meet the objectives through an exemplary project, our work was guided by 4 directions:
- - Give the facility a second lease of life, by offering a functional organisation in line with current uses and a modern architecture,
- - Provide constructive and environmental responses that are realistic and pragmatic, in line with the budget,
- - Offer a facility combining sport, leisure and conviviality for users,
- - Design a durable, secure building with controlled maintenance.